About Visit Research Topics Collections Digitized Collections Museum News Contact
Search
Rosenberg Library
Galveston History
About
History & MissionFAQReading Room PoliciesReproduction PoliciesResearch ServicesDonationsVolunteering and Internships
Visit
Hours and LocationGroup Visits
Research Topics
Galveston Unscripted1900 StormCivil WarJuneteenthGenealogyHouse/Property HistoryBlack GalvestonJean LaffiteKarankawaSeawallGrade RaisingGalveston 1890-19001909 Storm1915 Storm
Collections
ManuscriptsPhotographs & PostcardsVertical FilesMapsNewspapersPeriodicalsBooks & Rare BooksOral HistoriesSheet Music
Digitized Collections
Digitized PhotographsDigitized ManuscriptsNewspapersCity DirectoriesFilmsResearch DatabasesTexas Artists & Artisans
Museum News Contact

Tag: Pilings

  • Home >
  • Tag: Pilings
G-1771FF11.1-4 Beach Hotel pili[ngs] Beach Hotel pili[ngs]
G-1771FF2.1-11 One of the Mallory line grounded where the wagon bridge stood One of the Mallory line grounded where the wagon bridge stood
G-5925.1FF1-1 THE GALVESTON SEAWALL."  "LAYING THE FOUNDATION - 3 ROWS OF 50 FT. PILING, AND 1 ROW SHEET PILING. THE GALVESTON SEAWALL." "LAYING THE FOUNDATION - 3 ROWS OF 50 FT. PILING, AND 1 ROW SHEET PILING.
G-5925.1FF1-10 Driver Placing 24 Ft. Sheet Piling Driver Placing 24 Ft. Sheet Piling
G-5925.1FF1-11 Driving piles along beach Driving piles along beach
G-5925.1FF1-12 Driving piles along beach Driving piles along beach
G-5925.1FF1-13 Workmen driving piles along beach Workmen driving piles along beach
G-5925.1FF1-3 THE GALVESTON SEAWALL."  " LAYING THE FOUNDATION - 3 ROWS OF 50 FT. PILING, AND 1 ROW SHEET PILING. THE GALVESTON SEAWALL." " LAYING THE FOUNDATION - 3 ROWS OF 50 FT. PILING, AND 1 ROW SHEET PILING.
G-5925.1FF1-5 THE GALVESTON SEAWALL.  Showing three rows of 50-ft. piling and one row of 30-ft. sheet piling for foundation and breakwater below the wall. THE GALVESTON SEAWALL. Showing three rows of 50-ft. piling and one row of 30-ft. sheet piling for foundation and breakwater below the wall.
G-5925.1FF1-7 GALVESTON SEAWALL.  PILE DRIVER AT WORK. GALVESTON SEAWALL. PILE DRIVER AT WORK.
G-5925.1FF1-9 Workman standing to one side of pile driver on beach Workman standing to one side of pile driver on beach
G-5925.1FF2-3 C[o]nstr[u]ct[in]g Galv Seawall.  Sheet Piling & 4 rows of round piling for foundation. C[o]nstr[u]ct[in]g Galv Seawall. Sheet Piling & 4 rows of round piling for foundation.
G-5925.1FF2-4 5 ROWS OF PILING OVER WHICH BASE IS CAST 5 ROWS OF PILING OVER WHICH BASE IS CAST
G-5925.1FF2-7 CASTING FIRST LAYER OF CONCRETE OVER PILING TOPS CASTING FIRST LAYER OF CONCRETE OVER PILING TOPS
G-5925.1FF3-14 Dragline excavating beach for Seawall foundation Dragline excavating beach for Seawall foundation
G-59262FF2-4 Holm Excavating Canal Near Sealy Hospital Holm Excavating Canal Near Sealy Hospital
G-59263FF1-14 G-59263FF1-14
G-59263FF4-2 G-59263FF4-2
G-59263FF4-3 G-59263FF4-3
G-59263FF5-6 Ships anchored at Galveston Ships anchored at Galveston
G-59263FF7-4 Driving piling for a discharge station Driving piling for a discharge station
SC #31-5 Special Collection #31, 1900 Storm Collection, 5 Special Collection #31, 1900 Storm Collection, 5
SC#194-35 View of beach and pilings in water. View of beach and pilings in water.
SC#194-36 Ruins of Beach Hotel (burned August 23, 1898). Ruins of Beach Hotel (burned August 23, 1898).
Archives Catalog
Library Catalog
Museum Catalog
Search Site
Search the Archives Catalog to find photographs and manuscript collections
Full Library Search
Full Museum Search
Galveston History Center
Facebook
Twitter
Instagram

Explore

  • About
  • Visit
  • Research Topics
  • Collections
  • Digitized Collections
  • Museum
  • News
  • Contact

Get in Touch

(409) 763-8854 ext. 126
gthc@rosenberg-library.org
‍

Galveston and Texas History Center
Rosenberg Library
2310 Sealy Avenue
Galveston, TX 77550

Open Tue-Sat 10-5
Directions & Maps

© 2026 Galveston & Texas History Center