|
Galveston
and Texas History Center | |
| GTHC Home Pre-1900 Storm 1900 Storm 1909 Storm 1915 Storm 1919 Storm Causeway Grade Raising Seawall | |
The causeway gives Galveston a convenient and economical connection with the mainland. Construction started July 21, 1909 and was completed in May, 1912.
Arches: CO2-12,
CO2-13, CO2.1-1,
CO2.1-2, CO2-10
Barges: CO2-13
Boats: CO2-10, CO2-11
Bracing: CO2-3
Bridges – Lift: CO2.1-4a, CO2.1-4c
Bridges – Trestle: CO2.1-4b, CO2-8,
CO2-13, CO2-15
Concrete: CO2-3
Cranes – Construction: CO2-9, CO2-14,
CO2-11
Crib: CO2-2, CO2-3
Freight Cars: CO2-1, CO2-8,
CO2-9
Galveston Bay: CO2-2, CO2-5,
CO2-6, CO2-8,
CO2-9, CO2-12,
CO2-13, CO2-14,
CO2-15, CO2.1-1,
CO2.1-2, CO2.1-4a,
CO2.1-4b, CO2.1-4c,
CO2-10, CO2-11
People: CO2-1, CO2-13,
CO2-14, CO2-15,
CO2-10, CO2-11
Piers: CO2-2
Pile Drivers: CO2-2, CO2-6,
CO2-13
Piles – Concrete: CO2-1, CO2-4,
CO2-5, CO2-6,
CO2-12
Piles – Steel: CO 2-3
Railroads: CO2-1, CO2-8,
CO2-9
Sheeting – Steel: CO2-2
Workmen: CO2-1, CO2-13,
CO2-14, CO2-15,
CO2-10, CO2-11
Galveston and Texas History Center I Rosenberg Library
Funding for the 1900 Storm Photo Exhibit
was provided by a TexTreasures grant from the Institute
of Museum and Library Services and the Texas
State Library and Archives Commission
If you are interested
in a copy of this image, please review our
photo reproduction policy and contact us by e-mail.
Galveston and Texas
History Center, Rosenberg Library, 2310 Sealy Avenue, Galveston TX 77550
Voice (409) 763-8854 ext. 127- Fax (409) 763-0275
GTHC
WebTeam GTHC, Rosenberg Library.